• University Villages / University Estates

    CHALLENGE
    Renovate 1,500 student housing units for two properties – including two leasing offices, two clubhouses, and two fitness centers.

    MAVERICK SOLUTION
    End-to-end, we managed all aspects of design, architecture, approvals, permitting, construction value engineering, purchasing and installation for both properties.

    RESULT
    The successful renovation of both properties launched a hugely successful re-leasing campaign for 2014/15.

  • TRYP Times Square

    CHALLENGE
    Rebrand the existing Best Western to a TRYP Hotel in the heart of Manhattan’s Times Square in 8 months.

    MAVERICK SOLUTION
    Acting as owner’s representative, we provided project oversight, coordinated construction and occupancy with minimal displacement of revenue and completed the project on time and under budget.

    RESULT
    The rebranded hotel opened under the TRYP flag in March 2015.

  • XO Communications

    CHALLENGE
    Build out a 50,000-square-foot ColoSpace data center, ensuring precise atmospheric compliance required for high-tech facilities.

    MAVERICK SOLUTION
    We installed 900 tons of rooftop chillers on the premiere data center building, 111 8th Avenue in Manhattan, while managing all aspects of construction and installation.

    RESULT
    A successful and 100% compliant data center – complete with redundancy systems for all fiber optics, backup power and cooling technologies.

  • Gallerie Élysées

    CHALLENGE
    Create an upscale gallery in a Trump-owned building on Central Park South – but do it in nine short weeks.

    MAVERICK SOLUTION
    Tapping into our depth of gallery experience, we managed and coordinated all aspects of design, architecture, approvals, permitting, construction and installation.

    RESULT
    A stunning and successful modern space, leased to a French-owned gallery – completed under budget, and within the required tight time frame.

  • Westchase

    CHALLENGE
    Modernize a 560,000-square-foot office tower first erected in 1982.

    MAVERICK SOLUTION
    We executed and managed the complex capital program – including all elevator, sprinkler and HVAC upgrades.

    RESULT
    Project was completed on time, on budget, and with what ownership called “a refreshing lack of drama”

  • Grohe Live Showroom

    CHALLENGE
    Create a 15,000-square-foot interactive modern showroom – utilizing existing office space – in Manhattan’s Flatiron District. Must-haves: multiple functioning wet features, bathroom and kitchen vignettes, corporate offices, plus a training center.

    MAVERICK SOLUTION
    From concept through installation, we managed the entire process – architects, engineers, design, capital, risk management, even the high-pressure pumps and secondary/tertiary water-proofing.

    RESULT
    A state-of-the-art interactive showroom that was received to critical acclaim and public applause – all completed on time and under budget.

  • Residence Inn Manhattan Beach

    CHALLENGE
    Demolish and rebuild the hotel’s gatehouse, renovate 176 rooms and suites, add new pool to comply with brand standards – all while maintaining displaced concierge and guest services, including food and beverage, throughout the entire construction process.

    MAVERICK SOLUTION
    On-premise, we created a temporary kitchen inside a trailer and rented a party tent – complete with AC, AV and a patio – so guests were never inconvenienced and could feel as if the property were 100% functional. A unique and effective value-add solution warmly appreciated by the ownership.

    RESULT
    The hotel had minimum displacement of service or revenue – and the guest experience was fully maintained. Bonus: the project was completed on time and under budget.

  • Bethesda Medical Center

    CHALLENGE
    With no impact on tenants or support staff, provide a full roof recovery, replace 50+ rooftop HVAC units, plus upgrade all public spaces for 160,000-square-foot medical facility offering 24/7 triage.

    MAVERICK SOLUTION
    Maverick managed the design and installation of new signage and renovation of lobbies and common areas throughout property.

    RESULT
    The property was immediately sold by the owner for profit.

  • Newark Hilton

    CHALLENGE
    Renovate multiple public lobby spaces while adhering to strict Hilton brand standards.

    MAVERICK SOLUTION
    With a full understanding of approved Hilton color palettes, textures, materials and décor, we managed all aspects of design, architecture, approvals, permitting, construction, value engineering, purchasing and installation.

    RESULT
    The refreshed and modernized Newark Hilton lobby was completed on time and under budget.